M6-Duna

You must allow scripting to view this site. Also Flash Player 8 is required.

The M6 from a Technical Point of View

The Concession Area of the M6 Project includes the section of the M6 from Érdi Tető to Dunaújváros plus a stretch of the M8 motorway from the motorway interchange with the M6 towards the new Danube bridge south of Dunaújváros. On total these are

Technical Details

Motorway M6

Motorway M8

The route of the M6 Motorway crosses two counties; from the start at km 22+150 up to km 28+400, the motorway runs in the territory of the Pest County, from km 28+400 on it runs in the territory of Fejér County.

The route touches the municipal boundaries of the following municipalities:

Érd, Százhalombatta, Ercsi, Ráckeresztúr, Besnyő, Beloiannisz, Iváncsa, Adony, Kulcs, Rácalmás, Dunaújváros, Baracs, Kisapostag, Nagyvenyim

Following the design 10 non-level crossings were constructed to ensure the link between the motorway and the public road network. The layout of these interchanges varies from trumpet to clover.

Design speed and cross section of the motorway

The design speed of the motorway is 140 km/h

Cross-section data:

The general pattern of the motorway cross-section is shown in the drawing below (click to enlarge).

Service areas, Operation & Maintenance Centre, Petrol stations

Along the M6 motorway service areas are situated in each direction at the following locations:

At the exit of Adony, the Operation & Maintenance Centre and the Motorway Police is located.


Webdesign, Webapplikationen, Content Management Systeme (CMS), Suchmaschinenoptimierung (SEO) und Web 2.0 Plattformen von Blue Monkeys - Your Success is our Banana